Bunkering
Checklist
Vessel:
|
|
Date:
|
A – Before Bunkering
|
Comment
|
¡
Is there any oil spill in
water before connecting the bunker hose?
|
|
¡
Plug all deck scuppers.
|
|
¡
Check drip trays under
hose coupling and ship’s supply connection – ensure fixing of plugs.
|
|
¡
Ensure the availability
of oil absorbent materials.
|
|
¡
Check that air pipes for
bunker tanks are opened & unlocked.
|
|
¡
Confirm the proper
mooring of bunker barge through the Ch. Officer.
|
|
¡
Reconfirm the soundings
of bunker receiving tanks.
|
|
¡
Check, agree & record
tanks’ soundings for bunker barge.
|
|
¡
Inspect supply hose and
coupling for damage.
|
|
¡
Check the proper
connection between supply hose and vessel’s receiving connection.
|
|
¡
Check the status of inlet
valves for vessel’s bunker receiving tanks, to be held by Ch. Engineer.
|
|
¡
Establish communication
link between vessel & suppliers also for emergency case.
|
|
¡
Ensure that non-smoking
signs are posted.
|
|
¡
Agree the starting pump
rate.
|
|
¡
Agree the max-pumping
rate after ensuring connections tightness.
|
|
Ch.
Engineer: -
|
Name :
|
Signature
:
|
Date :
|
Bunkering
Checklist
(Continued)
B – During Bunkering
|
Comment
|
¡
Are the assigned
personnel in their applicable positions for monitoring?
|
|
¡
Maintain the frequent
check of tanks’ soundings.
|
|
¡
Reduce pumping rate and /
or open next tank before topping off.
|
|
¡
Ensure the proper
relative positions between bunker barge and vessel.
|
|
¡
|
|
¡
|
|
¡
|
|
¡
|
|
¡
|
|
C – After Bunkering
|
Comment
|
¡
On completion, ensure all
hoses are fully drained.
|
|
¡
Close all filling valves,
to be held by Ch. engineer.
|
|
¡
Take fuel sample with the
required date & seal it.
|
|
¡
Check, agree & record
barge tanks soundings.
|
|
¡
Record data for bunker
operation in Oil Record Book & Engine Room Log Book, also Deck Log Book.
|
|
Ch.
Engineer :-
|
Name :
|
Signature
:
|
Date :
|
No comments:
Post a Comment